
These are general university specifications, organized into divisions by the Construction Specifications Institute. These documents are for reference only, and it is the contractors' responsibility to check with the appropriate department(s) for current specifications. For information about particular projects or buildings, please contact Campus Facilities or Maintenance Services.
All files require the Adobe Acrobat Reader.Get the form for Facility Standards/Guidelines Deviation.
Division 01 - General Guidelines
Facility Life Cycle Design Guidelines
Division 2 - Site Work (all sections) (180K)
Division 3 - Concrete (all sections)
Division 4 - Masonry (all sections)
Division 7 - Thermal and Moisture Protection (all sections)
07180 Water Repellents
07200 Insulation
07250 Fireproofing
07530 Single Ply Membrane Roofing
07600 Sheet Metal Flashings
07900 Joint Sealers
Division 8 - Doors and Windows (all sections)
08410 Aluminum Entrances and
Storefronts
08520 Aluminum Windows
08710 Door Hardware
08920 Glazed Aluminum Curtain Walls
Division 9 - Finishes (all sections)
09260 Gypsum Board Systems
09510 Acoustical Ceilings
09660 Resilient Tile Flooring
09665 Resilient Sheet Flooring
09678 Resilient Base and Accessories
09900 Painting
Division 10 - Specialties (all sections)
10100 Visual Display Products
10155 Toilet Compartments
10260 Wall and Corner Guards
10440 Interior Signage
10440CAD Interior Signage CAD drawing
Signage drawing requires Whip viewer
10520 Fire Extinguishers and Cabinets
Division 13 - Special Construction (all
sections)
13825 Card Access Security System
| DG15-0 |
Basic Mechanical Guidelines and Methods General, General Codes, Submittals, O&M Manual Requirements, Shop Drawing Handling, Mechanical Identification, Mechanical Commissioning |
| DG15-1 | Building Service Piping |
| DG15-2 |
Process Piping Special piping systems & components |
| DG15-3 |
Fire Protection Systems & Equipment Fire Pumps, Sprinkler Systems, Fire Extinguishers Gas Systems, Fire Hydrants, StandPipe & Hose, Fire Detection & Alarms |
| DG15-4 |
Plumbing Systems and Equipment Fixtures, Piping, Equipment, Domestic Water Heaters |
| DG15-5 | Heating Systems & Equipment |
| DG15-6 |
Refridgeration Systems & Equipment Refrigeration Piping System, Condenser Water Piping, Refrigerationi Compressor, Condensing Units(Air/Water), Chiller (Electric/Steam) Evaporators, Package DX , Split DX, Cooling Towers Cooling Tower Water Treatment |
| DG15-7 | HVAC Equipment |
| DG15-8 | Air Distribution |
| DG15-9 |
Building Automation Systems & Controls Sequence of Operations |
Division 17 - Telecommunications (Under construction)
NOTE: WHEN SPECIFIC PROJECT SPECIFICATIONS ARE PROVIDED, THESE DOCUMENTS MAY BE USED TO AUGMENT, BUT NOT SUPERSEDE, THE OTHER DOCUMENTS.
